LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2006 >> Verona Base >> Repair and Diagnosis >> Heating, Ventilation & A/C (HVAC) >> HVAC Control Systems >> Air Conditioning System >> Automatic >> Repair Instructions >> High-Blower Relay Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

High-Blower Relay Installation

  1. Install the screws with the high blower relay.
  2. Connect the electrical connector.
  3. Install the glove box lower panel cover. Refer to GLOVE BOX INSTALLATION .
    Fig 1: Identifying High-Blower Relay
    G04720133Courtesy of SUZUKI OF AMERICA CORP.