Crankshaft Sprocket Installation (Third Design)
WARNING: This page is about a different car, the 2007 Suzuki XL7. However, it is still accessible from the selected car via links, so may be relevant.
Special Tool
EN 46111 Crankshaft Rotation Socket
- Ensure the crankshaft sprocket is installed with the timing mark (1) visible.
- Install the crankshaft sprocket on to the nose of the crankshaft.
- Align the notch in the crankshaft sprocket with the pin in the crankshaft.
- Slide the crankshaft sprocket on the crankshaft nose until the crankshaft sprocket contacts the step in the crankshaft.
- Ensure the crankshaft is in the stage one timing position with the crankshaft sprocket timing mark (1) aligned to the stage one timing mark on the oil pump cover (2) using the EN 46111. Refer to CAMSHAFT TIMING DRIVE CHAIN ALIGNMENT DIAGRAM (THIRD DESIGN) and CAMSHAFT TIMING DRIVE CHAIN ALIGNMENT DIAGRAM (FOURTH DESIGN) - Stage One.
Reference: CAMSHAFT INTERMEDIATE DRIVE CHAIN IDLER INSTALLATION - LEFT SIDE (THIRD DESIGN) .