LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Volkswagen >> 2017 >> Passat R-Line >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 1 (Fuel Preparation And Injection System (Service Information - CDVB)) >> 24 Fuel Preparation And Injection >> Intake Manifold >> Intake Manifold Upper Section, Removing And Installing >> Installing
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Intake Manifold Upper Section, Removing And Installing: Installing

WARNING: This page is about a different variant/trim than selected.
NOTE:

Remove the seals from the intake manifold lower section and install them again just installing the intake manifold lower section to keep them clean.

-- Install the sealing rings in the intake manifold upper section and lightly coat them with clean engine oil.

GWWN24-10508Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.

-1- >>large<< sealing rings

-2- >>small<< gaskets

-- Mount the intake manifold upper section onto the intake manifold lower section.

-- Tighten intake manifold upper section/intake manifold lower section retaining bolts evenly starting from the inside and working toward the outside -1 to 5-. Tightening specification: 10 Nm.

Fig 1: Intake Manifold Bolt Tightneing Sequence
GWWN24-10460Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.

-- Then tighten mounting bolts on intake manifold support.

Further assembly is performed in the reverse order of the removal.

Tightening specifications. Refer to OVERVIEW - INTAKE MANIFOLD .