Secondary Air Injection Solenoid Valve, Checking: Procedure
-- Disconnect the Secondary Air Injection (SAI) Solenoid Valve --N112-- electrical harness connector.
Checking internal resistance
-- Using a multimeter, check the Secondary Air Injection (SAI) Solenoid Valve --N112-- terminals 1 to 2 for resistance.
Specified value: 3.5 - 8.5 Ω (at approx. 20 °C)
If the specified value was Not obtained:
-- Replace the Secondary Air Injection (SAI) Solenoid Valve --N112--.
If the specified value was obtained:
Checking voltage supply
Start the engine.
-- Using a multimeter, check the Secondary Air Injection (SAI) Solenoid Valve --N112-- electrical connector terminal 1 to Ground for voltage.
Specified value: Battery voltage.
Switch the ignition OFF.
If the specified value was Not obtained:
-- Check the wiring from the Secondary Air Injection (SAI) Solenoid Valve --N112-- electrical connector terminal 1 to the Secondary Air Injection (SAI) Pump Relay -J299- or Fuel Pump Relay -J17- for a short circuit to Ground, or an open circuit. Refer to Wiring Diagrams for circuit layout/pin locations.
-- Check the electrical harness connector for damage, corrosion, loose or broken terminals.
-- If necessary, repair the wiring connection.
If the specified value was obtained: