LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Volkswagen >> 2011 >> Jetta Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 123 (2.0L - Engine Assembly - Engine Code: CVCA (Convertible)) >> 10 Engine Assembly >> Removal And Installation >> Engine, Installing >> Tightening Specifications
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Tightening Specifications

WARNING: This page is about a different car, the 2015 Volkswagen Beetle. However, it is still accessible from the selected car via links, so may be relevant.
CAUTION: After the high pressure line assembly, and when installing a new short engine, it is particularly important to tighten the fuel injector tensioning claw to the previously mentioned tightening specification, refer to OVERVIEW - FUEL INJECTORS . Only tighten the tensioning claws >>hand tight<< after delivery when assembling the high pressure line in order to align the fuel injector. Engine damage may occur if not observed.
NOTE:

After installing new parts (engine/partial engine, cylinder head, camshaft housing or turbocharger) limit the oil pressure regulation for approximately 1000 km to the higher pressure stage. From this, the higher friction is taken into account when breaking in new components, and the optimum removal of particles from the initial wear in is ensured. To do this connect the vehicle diagnostic tester, switch on the ignition and select the following menu items:

01 - Engine electronics 

Guided functions 

Adaptations 

Oil pressure regulation/retraction activating 

Component Nm
Bolts and nuts M6 10
- M7 15
- M8 20
- M10 40
- M12 65