LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Volkswagen >> 2011 >> CC R-Line, 2.0 P, Automatic DCT >> Repair and Diagnosis >> Engine Performance >> System >> 2.0L - Generic Scan Tool - Engine Code(S): CBFA >> St Generic Scan Tool >> Diagnosis And Testing >> Diagnostic Procedures >> Secondary Air Injection Solenoid Valve, Checking
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Secondary Air Injection Solenoid Valve, Checking

Special tools and workshop equipment required 

Test requirements 

Test procedure 

-- Perform a preliminary check to verify the customers complaint. Refer to PRELIMINARY CHECK .

Start diagnosis 

NOTE:

Voltage is supplied to the Secondary Air Injection (AIR) Solenoid Valve -N112- from fuse 24 in Fuse Box B.

Procedure 

-- Disconnect the Secondary Air Injection (AIR) Solenoid Valve -N112- electrical harness connector -1-.

Fig 1: Identifying Secondary Air Injection (AIR) Solenoid Valve
GWWA24-10611Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.

Checking internal resistance 

-- Using a multimeter, check the Secondary Air Injection (AIR) Solenoid Valve -N112- terminals 1 to 2 for resistance.

Specified value: 3.5-8.5 Ω (at approx. 20° C)

If the specified value was Not obtained:

-- Replace the Secondary Air Injection (AIR) Solenoid Valve -N112-. Refer to the Repair Information.

If the specified value was obtained:

Checking voltage supply 

Switch the ignition ON.

-- Using a multimeter, check the Secondary Air Injection (AIR) Solenoid Valve -N112- electrical connector terminal 1 to Ground for voltage.

Specified value: Battery voltage.

Switch the ignition OFF.

If the specified value was Not obtained:

-- Check the wiring from the Secondary Air Injection (AIR) Solenoid Valve -N112- terminal 1 to fuse 20 in Fuse Panel B for a short circuit to Ground, or an open circuit.

-- Check the electrical harness connector for damage, corrosion, loose or broken terminals.

-- If necessary, repair the wiring connection and replace fuse 20 in Fuse Panel B if blown.

If the specified value was obtained:

Checking wiring 

-- Remove the Engine Control Module (ECM) -J623-. Refer to the Repair Information.

-- Using a multimeter --, check the Secondary Air Injection (AIR) Solenoid Valve -N112- electrical harness connector to the Engine Control Module (ECM) -J623- electrical harness connector T60 for an open circuit.

Fig 2: Identifying 2-Pin Electrical Connector & Terminals
GWWA28-0040Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.
Secondary Air Injection (AIR) Solenoid Valve -N112- electrical harness connector terminal Engine Control Module (ECM) -J623- electrical connector T60 terminal or test box socket
2 17

Specified value: 1.5 Ω Max.

If the specified value was Not obtained:

-- Check the wiring for an open, high resistance or short to ground.

-- Check the electrical harness connector for damage, corrosion, loose or broken terminals.

-- If necessary, repair the faulty wiring connection.

If no malfunction is detected in the wiring and the voltage supply was OK:

-- Replace the Engine Control Module (ECM) -J623-. Refer to the Repair Information.

Final procedures 

After the repair work, the following work steps must be performed in the following sequence:

  1. Check the DTC memory. Refer to DIAGNOSTIC MODE 03 - READ DTC MEMORY .
  2. If necessary, erase the DTC memory. Refer to DIAGNOSTIC MODE 04 - ERASE DTC MEMORY .
  3. If the DTC memory was erased, generate readiness code. Refer to READINESS CODE .