Oxygen Sensor Heater After Catalytic Converter, Checking
When servicing terminals 3 and 4 in harness connector of oxygen sensors, use only gold-plated terminals.
Special tools and workshop equipment required
- Multimeter VAG1526 or multimeter VAG1715
- Connector test kit VAG1594
- Wiring diagram
Test requirements
- Fuses in E-box (in plenum chamber, left) must be OK: Refer to SYSTEM WIRING DIAGRAM
- Motronic Engine Control Module (ECM) Power Supply Relay -J271- must be OK, check: Refer to SYSTEM WIRING DIAGRAM
- Battery voltage must be at least 11.5 volts.
- All electrical consumers such as, for example, lights and rear window defroster must be switched off.
- Parking brake must be engaged or else daylight driving lights will be switched on.
- For vehicles with automatic transmission, selector lever must be in P position.
- If vehicle is equipped with an A/C system, it must be switched off.
- Ground (GND) connections between engine and chassis must be OK.
Test sequence
-- Disconnect 4-pin harness connector to the respective oxygen sensor:
- Oxygen Sensor (O2S) Behind Three Way Catalytic Converter (TWC) -G130-, bank 1, 4-pin harness connector 1-,
- Oxygen Sensor (O2S) 2 Behind Three Way Catalytic Converter (TWC) -G131-, bank 2, 4-pin harness connector 3-,
Bank 1 = Cylinder bank 1, in direction of travel, right.
Bank 2 = Cylinder bank 2, in direction of travel, left.
Checking voltage supply and wiring to control module
-- Connect multimeter to terminals 1 +2 of connector to Engine Control Module (ECM) for voltage measurement.
-- Start engine, and let run at idle.
Specified value: at least 7.0 V
If specified value is obtained:
-- Switch ignition off.
-- Erase DTC memory of Engine Control Module (ECM), Diagnostic mode 4: Reset/erase diagnostic data.
-- Generate readiness code.
If specified value is not obtained:
-- Connect multimeter to terminal 1 of connector to Engine Control Module (ECM) + Ground (GND) for voltage measurement.
Specified value: at least 11.0 V
-- Switch ignition off.
If specified value is not obtained:
-- Check voltage supply at 4-pin connector terminal 1 to Motronic Engine Control Module (ECM) Power Supply Relay -J271- according to wiring diagram: Refer to SYSTEM WIRING DIAGRAM
-- Erase DTC memory of Engine Control Module (ECM), Diagnostic mode 4: Reset/erase diagnostic data.
-- Generate readiness code.
If specified value is obtained:
-- Check Ground (GND) activation of the respective oxygen sensor heater.
Checking Ground (GND) activation
-- Connect test box to control module wiring harness, connect test box for wiring test.
-- Check wires between test box and 4-pin connector to Engine Control Module (ECM) for open circuit according to wiring diagram.
Wire resistance: max. 1.5 Ω
| Component | Connector | Test box |
|---|---|---|
| Bank 1 sensor 2 | Terminal 2 | Socket 63 |
| Bank 2 sensor 2 | Terminal 2 | Socket 6 |
-- Also check wires for short circuit to B+ or Ground (GND).
Specified value: ∞ Ω
-- Erase DTC memory of Engine Control Module (ECM), Diagnostic mode 4: Reset/erase diagnostic data.
-- Generate readiness code.
If no malfunctions are found in wires:
-- Replace Motronic Engine Control Module (ECM) -J220- ENGINE CONTROL MODULE, REPLACING .