Work sequence
- Install lower coolant hose and secure with retaining clamp - arrow -.
- Slide coolant hoses onto oil cooler unions - arrows - and secure with spring-type clamps.
- Install center insulation tray: → 50 BODY, FRONT
Without using coolant system charging unit VAS 6096
- Fill coolant slowly up to top mark of hatched field on expansion tank.
Using coolant system charging unit VAS 6096
- Screw adapter VAG 1274/8 onto expansion tank.
- Fill coolant system using coolant system charging unit VAS 6096 : → Electrical Wiring Diagrams, Troubleshooting and Component Locations
With and without coolant system charging unit VAS 6096
- Seal expansion tank.
- Switch off heater and air conditioner.
- Start engine and maintain an engine speed of about 2000 rpm for approx. 3 minutes.
- Allow engine to run at idling speed until lower hose on radiator becomes hot.
- Switch ignition off.
- Check coolant level and top up coolant if necessary: At normal engine operating temperature coolant level must reach top mark of hatched field. When engine is cold coolant level should be around middle of hatched field.