LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Volkswagen >> 1993 >> EuroVan CV, Automatic >> Repair and Diagnosis >> Engine Performance >> Remove, Overhaul & Install >> Engine Controls - Remove/Install/Overhaul >> Ignition System >> Distributor >> Removal & Installation (EuroVan)
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Removal & Installation (EuroVan)

  1. Distributor removal procedure is not available from manufacturer. To install distributor, ensure cylinder No. 1 is at TDC of compression stroke. See Fig 1 .
  2. Align mark on camshaft sprocket with mark on rear toothed belt guard. Turn rotor so that it points to cylinder No. 1 mark on distributor housing. Insert distributor into engine. Check ignition timing.
Fig 1: Distributor Installation (EuroVan)
G93I81164Courtesy of VOLKSWAGEN UNITED STATES, INC.