LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Toyota >> 2013 >> Matrix S, AWD >> Repair and Diagnosis >> Electrical >> Charging Systems >> Charging System (2AZ-FE) (Service Information) >> Generator >> Installation >> Installation
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Charging System (2AZ-FE) (Service Information): Generator: Installation: Installation

  1. INSTALL GENERATOR ASSEMBLY 
    1. Install the wire harness clamp bracket with the bolt.
      Fig 1: Locating Wire Harness Clamp Bracket With Bolt
      GTY161045Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 8.4 N*m (86 kgf*cm, 74 in.*lbf) 

    2. Install the generator assembly with the 2 bolts.
      Fig 2: Identifying Bolts
      GTY235373Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Bolt A 

      Torque: 52 N*m (530 kgf*cm, 38 ft.*lbf) 

      Bolt B 

      Torque: 21 N*m (215 kgf*cm, 16 ft.*lbf) 

    3. Install the generator connector and 2 wire harness clamps.
      Fig 3: Identifying Terminal Cap, Nut, Generator Connector And Harness Clamps
      GTY194524Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Install the wire harness to terminal B with the nut and install the terminal cap.

      Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf) 

  2. INSTALL V-RIBBED BELT  . Refer to INSTALLATION - Step 1
  3. INSTALL ENGINE UNDER COVER RH 
  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL