LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Toyota >> 2007 >> Prius Base >> Repair and Diagnosis >> Heating, Ventilation & A/C (HVAC) >> HVAC Control Systems >> Air Conditioning >> Air Conditioning System >> IG Power Source Circuit >> Inspection Procedure
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Inspection Procedure

  1. INSPECT FUSE (A/C (HTR)) 
    1. Remove the A/C (HTR) fuse from the driver side junction block.
    2. Measure the resistance of the fuse.

      Standard resistance: Below 1 Ω 

    NG : REPLACE FUSE 

    OK : GO TO NEXT STEP 

  2. CHECK AIR CONDITIONING AMPLIFIER (IG VOLTAGE) 
    1. Remove the air conditioning amplifier with connectors still connected.
    2. Measure the voltage of the wire harness side connector.

      Standard voltage 

      TERMINALS VOLTAGE SPECIFICATIONS

      Tester Connection Condition Specified Condition
      A8-5 (IG) - A8-1 (GND) Power switch ON (IG) 10 to 14 V

    NG : PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN  PROBLEM SYMPTOMS TABLE  

    Fig 1: Identifying Air Conditioning Amplifier Connectors
    G04475112Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

    NG : GO TO NEXT STEP 

  3. CHECK WIRE HARNESS (AIR CONDITIONING AMPLIFIER - BATTERY AND BODY GROUND) 
    1. Measure the voltage of the wire harness side connector.

      Standard voltage 

      TERMINALS VOLTAGE SPECIFICATIONS

      Tester Connection Condition Specified Condition
      A8-5 (IG) - Body ground Power switch ON (IG) 10 to 14 V
    2. Measure the resistance of the wire harness side connector.

      Standard resistance 

      TERMINALS RESISTANCE SPECIFICATIONS

      Tester Connection Specified Condition
      A8-1 (GND) - Body ground Below 1 Ω

    NG : REPAIR OR REPLACE HARNESS AND CONNECTOR 

    Fig 2: Disconnecting A8 Amplifier Connector
    G04475113Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

    OK : REPLACE AIR CONDITIONING AMPLIFIER