LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2013 >> Kizashi Base, Standard Trans >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 1 (Continuously Variable Transaxle (CVT)) >> Repair Instructions >> Shift Lock Solenoid Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Shift Lock Solenoid Inspection

WARNING: This page is about a different variant/trim than selected.
CAUTION:
  • When connecting cables from battery for operation check, make sure not to create any accidental shorts.
  • Reverse connection of polarity may damage shift lock solenoid.
  1. Remove console box, see CENTER CONSOLE BOX REMOVAL AND INSTALLATION .
  2. Disconnect select lever connector (1).
  3. Check that shift lock solenoid rod moves smoothly and returns when positive terminal of battery is connected to terminal "5" and negative terminal of battery is connected to terminal "10". If solenoid rod does not move smoothly, replace select lever assembly.
    Fig 1: Identifying Select Lever Connector
    G06527866Courtesy of SUZUKI OF AMERICA CORP.