CPP Switch Inspection and Adjustment: Inspection

WARNING: This page is about a different car, the 2010 Suzuki Kizashi. However, it is still accessible from the selected car via links, so may be relevant.

Check for resistance between terminals under each condition below. If check result is not satisfactory, replace CPP switch.

CPP switch resistance 

When switch shaft is pushed (1): Continuity 

When switch shaft is free (2): No continuity 

Fig 1: Inspecting CPP Switch
G06528898Courtesy of SUZUKI OF AMERICA CORP.