LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2013 >> Kizashi Base, Standard Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 73 (Engine Mechanical) >> Repair Instructions >> Throttle Body Assembly Removal and Installation >> Removal
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Throttle Body Assembly Removal and Installation: Removal

WARNING: This page is about a different car, the 2010 Suzuki Kizashi. However, it is still accessible from the selected car via links, so may be relevant.
  1. Disconnect negative (-) cable at battery.
  2. Drain coolant, see COOLING SYSTEM DRAINING .
  3. Remove air cleaner outlet hose (1).
    Fig 1: Identifying Air Cleaner Outlet Hose
    G06527420Courtesy of SUZUKI OF AMERICA CORP.
  4. Disconnect engine coolant hoses (2) and connector (3) from throttle body assembly (1).
  5. Remove throttle body bolts (4), and then remove throttle body assembly and gasket (5) from intake manifold.
    Fig 2: Identifying Throttle Body Bolts And Throttle Body Assembly
    G06527421Courtesy of SUZUKI OF AMERICA CORP.