LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2013 >> Kizashi Base, Automatic CVT Trans >> Repair and Diagnosis >> Heating, Ventilation & A/C (HVAC) >> HVAC Control Systems >> Air Conditioning System >> Repair Instructions >> Expansion Valve Removal and Installation >> Removal
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Expansion Valve Removal and Installation: Removal

  1. Recover refrigerant from A/C system. Refer to "RECOVERY " in Operation Procedure for Refrigerant Charge  .
  2. Remove liquid pipe bolt (1), and then remove liquid pipe (3) and suction hose (4) from expansion valve (2).
  3. Remove expansion valve bolts (5), and then remove expansion valve.
    Fig 1: Identifying Liquid Pipe Bolt, Liquid Pipe, Suction Hose, Expansion Valve Bolts And Expansion Valve
    G06526728Courtesy of SUZUKI OF AMERICA CORP.