LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2013 >> Kizashi Base, Automatic CVT Trans >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 1 (Manual Transaxle) >> Repair Instructions >> Back Up Light Switch Removal and Installation >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Back Up Light Switch Removal and Installation: Installation

WARNING: This page is about a different variant/trim than selected.

Reference: BACK UP LIGHT SWITCH INSPECTION 

  1. Apply transaxle oil to new O-ring (1) and tighten back up light switch (2) to specified torque.

    Tightening torque 

    Back up light switch (a): 19 N.m (1.9 kg-m, 14.0 lbf-ft) 

    Fig 1: Identifying O-Ring And Back Up Light Switch
    G06528772Courtesy of SUZUKI OF AMERICA CORP.
  2. Connect back up light switch connector.
  3. Install battery bracket, battery tray with ECM and battery, see BATTERY REMOVAL AND INSTALLATION .