Initialization Procedure
WARNING: This page is about a different car, the 2010 Suzuki Kizashi. However, it is still accessible from the selected car via links, so may be relevant.
- Select initialization procedure from table below.SERVICE ITEM REFERENCE
Initialization procedure Service item [A] Replace TCM with new one [B] - Replace TCM with used one
- Replace CVT assembly
- Perform selected INITIALIZATION PROCEDURE as follows.
Initialization procedure [A]:
- Push engine switch to change ignition mode to "ON" and shift select lever to "P" range.
- Check that the shift position indicated in information display comes on in approx. 2 sec. after engine switch is pressed to change ignition mode to "ON". If the shift position does not come on, check the following items:
- Check for open or shorted to ground in wiring harness between TCM and ROM in CVT assembly, see Inspection of TCM and Its Circuits .
- Check for proper terminal connection to TCM connector and solenoid connector.
Initialization procedure [B]:
- Confirm that ignition mode of keyless push start system is "OFF" and connect SUZUKI scan tool to DLC (1).
Special Tool
- SUZUKI scan tool (SUZUKI-SDT)
- Push engine switch to turn "ON" ignition switch.
- Select "Learning Value Initialization" function under "Utility" mode on SUZUKI scan tool, and follow the instructions displayed on SUZUKI scan tool.
- Push engine switch to change ignition mode to "OFF" and leave ignition mode in "OFF" for 10 sec.
- Shift select lever to "P" range.
- Check that the shift position indicated in information display comes on in approx. 2 sec. after engine switch is pressed to change ignition mode to "ON". If the shift position does not come on, check the following items:
- Check for open or shorted to ground in wiring harness between TCM and ROM in CVT assembly, see Inspection of TCM and Its Circuits .
- Check for proper terminal connection to TCM connector and solenoid connector.