LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2012 >> Kizashi FWD L4-2.4L >> Repair and Diagnosis >> Body and Frame >> Mirrors >> Power Mirror Switch >> Testing and Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Power Mirror Switch: Testing and Inspection




Power Door Mirror Switch Inspection

1) Remove power door mirror switch. Front Door Components
2) Check continuity between terminals at each switch position.

If check result is not as specified, replace switch.
Mirror switch continuity