LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2012 >> Equator RMZ-4 >> Repair and Diagnosis >> Engine Mechanical >> Engine Mechanical - VQ40DE >> Repair Instructions >> Intake Valve Timing Control: Intake Valve Timing Control Solenoid Valve (LH) >> Removal
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Intake Valve Timing Control: Intake Valve Timing Control Solenoid Valve (LH): Removal

  1. Disconnect intake valve timing control solenoid valve connector (LH).
  2. Remove intake valve timing control solenoid valve bolts (LH) and O-ring from rocker cover.
CAUTION: Do not reuse O-ring.