LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2012 >> Equator Base >> Repair and Diagnosis >> Heating, Ventilation & A/C (HVAC) >> HVAC Control Systems >> Ventilation System >> Repair Instructions >> Heater & Cooling Unit Assembly: Removal and Installation >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Heater & Cooling Unit Assembly: Removal and Installation: Installation

Installation is in the reverse order of removal.

CAUTION:
  • Replace the O-ring of the low-pressure A/C pipe and high-pressure A/C pipe with a new one, and apply compressor oil to the O-ring for installation.
  • After charging the refrigerant, check for leaks. Refer to [CHECKING OF REFRIGERANT LEAKS ].
NOTE: