LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2012 >> Equator Base >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 2 (Engine Mechanical - VQ40DE) >> Repair Instructions >> Intake Manifold: Removal and Installation >> Removal
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Intake Manifold: Removal and Installation: Removal

WARNING: This page is about a different variant/trim than selected.
  1. Remove intake manifold collector. Refer to [INTAKE MANIFOLD COLLECTOR: REMOVAL AND INSTALLATION ].
  2. Remove fuel tube and fuel injector assembly. Refer to [FUEL INJECTOR AND FUEL TUBE: REMOVAL AND INSTALLATION [VQ40DE] ]
  3. Loosen nuts and bolts with power tool in reverse order as shown to remove intake manifold.
    Fig 1: Intake Manifold Nuts And Bolts Loosening Sequence
    G06440901Courtesy of SUZUKI OF AMERICA CORP.
  4. Remove gaskets.
    CAUTION: Cover engine openings to avoid entry of foreign materials.