LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2012 >> Equator Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 30 (Engine Mechanical) >> Repair Instructions >> Cylinder Head Replacement - Right Side >> Installation Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation Procedure

WARNING: This page is about a different car, the 2007 Suzuki XL7. However, it is still accessible from the selected car via links, so may be relevant.
  1. If necessary, perform the following steps:
  2. Install a NEW cylinder head gasket.
    Fig 2: Identifying Cylinder Head
    G04841598Courtesy of SUZUKI OF AMERICA CORP.
  3. Carefully install the cylinder head with the exhaust manifold to the engine. Refer to CYLINDER HEAD INSTALLATION - RIGHT SIDE .
  4. Install the right bank secondary timing chain. Refer to INSTALLATION PROCEDURE .
  5. Install the engine. Refer to INSTALLATION PROCEDURE .