Circuit/System Testing
WARNING: This page is about a different car, the 2007 Suzuki XL7. However, it is still accessible from the selected car via links, so may be relevant.
- Ignition OFF, disconnect the 22-way automatic transmission (AT) wiring harness connector (C2) at the TCM.
- Test for 5-8 ohms of resistance between the PC solenoid high control circuit terminal and low control circuit terminal.
- If not within the specified range
- Remove the appropriate solenoid and test for 4-8 Ω of resistance.
- If not within the specified range, replace the valve body assembly.
- Replace the AT wiring harness, refer to WIRING HARNESS REMOVAL procedure and WIRING HARNESS INSTALLATION ] procedure.
- Replace the TCM, refer to TRANSMISSION CONTROL MODULE REMOVAL and TRANSMISSION CONTROL MODULE INSTALLATION procedure.