LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2012 >> Equator Base >> Repair and Diagnosis >> Engine Performance >> System >> Engine General Information & Diagnosis - Qr25DE (5 Of 5) >> Electrical Load Signal Circuit Check >> Diagnosis Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Diagnosis Procedure

DIAGNOSIS PROCEDURE CHART

Step Action YES NO
CHECK LOAD SIGNAL CIRCUIT OVERALL FUNCTION-II 
  1. Turn ignition switch ON.
  2. Connect SDT and select "Data list" mode.
  3. Select "LOAD SIGNAL" and check indication under the following conditions.
G06444382Courtesy of SUZUKI OF AMERICA CORP.

OK or NG 
INSPECTION END  GO TO 2.
CHECK HEADLAMP SYSTEM 
Refer to HEADLAMP: AIMING ADJUSTMENT or HEADLAMP: BULB REPLACEMENT
INSPECTION END