LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2012 >> Equator Base >> Repair and Diagnosis >> Electrical >> Horns >> Instrumentation/Driver Info./Horn >> Diagnostic Information and Procedures >> Key Switch Signal Circuit Check >> Diagnosis Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Diagnosis Procedure

Regarding Wiring Diagram information, refer to WARNING CHIME SYSTEM: WIRING DIAGRAM .

DIAGNOSIS PROCEDURE CHART

Step Action YES NO
CHECK FUSE 
Check if the key switch 10A fuse [No. 25, located in the fuse block (J/B)] is blown.
Is the fuse blown? 
Replace the blown fuse after repairing the affected circuit. GO TO 2
CHECK BCM INPUT SIGNAL 
Check voltage between BCM harness connector and ground.
Is the inspection result normal? 
Inspection End. GO TO 3
CHECK KEY SWITCH CIRCUIT 
  1. Disconnect BCM and key switch.
G06443214G06443215G06443216Courtesy of SUZUKI OF AMERICA CORP.SUZUKI OF AMERICA CORP.SUZUKI OF AMERICA CORP.

  1. 2. Check continuity between BCM harness connector M18 (A) and key switch harness connector M27 (B).
G06443214G06443215G06443216Courtesy of SUZUKI OF AMERICA CORP.SUZUKI OF AMERICA CORP.SUZUKI OF AMERICA CORP.

  1. 3. Check continuity between BCM harness connector M18 (A) and ground.
G06443214G06443215G06443216Courtesy of SUZUKI OF AMERICA CORP.SUZUKI OF AMERICA CORP.SUZUKI OF AMERICA CORP.

Is the inspection result normal? 
GO TO 4 Repair or replace harness.
CHECK KEY SWITCH POWER SUPPLY CIRCUIT 
Check voltage between key switch harness connector and ground.
Is the inspection result normal? 
Replace key switch. Repair or replace harness.