LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2012 >> Equator Base >> Repair and Diagnosis >> Body & Frame >> Glass/Windows/Mirrors >> Diagnostic Information and Procedures >> Door Mirror Defogger Circuit Check [RH] >> Diagnosis Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Diagnosis Procedure

Regarding Wiring Diagram information, refer to [REAR WINDOW DEFOGGER: WIRING DIAGRAM ].

DIAGNOSIS PROCEDURE

Step Action YES NO
CHECK POWER SUPPLY 
Check if the following fuse in the IPDM E/R is blown.
G00535680

Is the inspection result normal? 
GO TO 2 If fuse is blown, be sure to eliminate cause of malfunction before installing new fuse.
CHECK DOOR MIRROR DEFOGGER POWER SUPPLY CIRCUIT 
Check voltage between IPDM E/R harness connector E120 terminal 23 and ground.
G00535681G00535682
G00535681G00535682

Is the inspection result normal? 
GO TO 3 Replace IPDM E/R. Refer to [IPDM E/R (INTELLIGENT POWER DISTRIBUTION MODULE ENGINE ROOM): REMOVAL AND INSTALLATION ]
CHECK DOOR MIRROR DEFOGGER POWER SUPPLY CIRCUIT 
  1. Turn ignition switch OFF.
G06443656G00535683Courtesy of SUZUKI OF AMERICA CORP.

  1. 2. Disconnect door mirror RH.
  2. 3. Turn ignition switch ON.
  3. 4. Check voltage between door mirror RH harness connector D107 terminal 1 and ground.
G06443656G00535683Courtesy of SUZUKI OF AMERICA CORP.

Is the inspection result normal? 
GO TO 4 Repair or replace harness as necessary.
CHECK DOOR MIRROR DEFOGGER GROUND CIRCUIT 
Check continuity between door mirror RH harness connector D107 terminal 6 and ground.
G00535684

6 - Ground: Continuity should exist. 
Is the inspection result normal? 
GO TO 5 Repair or replace harness.
CHECK DOOR MIRROR DEFOGGER RH 
Check door mirror defogger RH.
Refer to [Component Inspection ].
Is the inspection result normal? 
Check intermittent incident. Refer to [SERVICE INFORMATION FOR ELECTRICAL INCIDENT: INTERMITTENT INCIDENT ]. Replace door mirror. Refer to [DOOR MIRROR ASSEMBLY: REMOVAL AND INSTALLATION ].