LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2012 >> Equator 2WD L4-2.5L >> Repair and Diagnosis >> Heating and Air Conditioning >> Hose/Line HVAC >> Service and Repair >> High-Pressure A/C Pipe
April 5, 2026: LEMON Manuals is launched! Read the announcement.

High-Pressure A/C Pipe




High-Pressure A/C Pipe: Removal and Installation

Removal

1) Remove the front right wheel and tire (VQ40DE only). Refer to [Wheel and Tire Assembly: Adjustment] Service and Repair.
2) Remove the front right mudguard (VQ40DE only). Refer to [Mudguard: Removal and Installation] Service and Repair.
3) Remove the front right fender protector (VQ40DE only). Refer to [Front Fender Protector: Removal and Installation] Front Fender Protector Removal and Installation.
4) Discharge the refrigerant. Refer to [HFC-134a (R-134a) Service Procedure] Service and Repair.
5) Remove the low pressure A/C pipe. Refer to [Low-Pressure A/C Pipe: Removal and Installation] Low-Pressure A/C Pipe.
6) Remove the high-pressure A/C pipe.

CAUTION:
Cap or wrap the joint of the pipe with suitable material such as vinyl tape to avoid the entry of air.

Installation

Installation is in the reverse order of removal.

Refer to [Refrigeration System: Component] Component.

CAUTION:

- Do not reuse O-rings.
- Apply A/C oil to the O-ring of the high-pressure A/C pipe for installation.
- After charging refrigerant, check for leaks.