LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2011 >> Grand Vitara Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 142 (Charging System) >> Diagnostic Information and Procedures >> Charging System Preliminary Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Charging System Preliminary Inspection

WARNING: This page is about a different car, the 2011 Suzuki Equator. However, it is still accessible from the selected car via links, so may be relevant.
DIAGNOSIS PROCEDURE

Step Action YES NO
CHECK BATTERY TERMINALS CONNECTION 
Check if battery terminals are clean and tight.
Is the inspection result normal? 
GO TO 2 Repair battery terminals connection.
CHECK FUSE 
Check for blown fuse and fusible link.
Is the inspection result normal? 
GO TO 3 Be sure to eliminate cause of malfunction before installing new fuse or fusible link.
CHECK GENERATOR GROUND TERMINAL CONNECTION 
Verify connector E209 terminal 5 (generator ground harness) is clean and tight.
Is the inspection result normal? 
GO TO 4 Repair connection.
CHECK DRIVE BELT TENSION 
Check drive belt tension. Refer to [CHECKING DRIVE BELTS ] (QR25DE) or [CHECKING DRIVE BELTS ] (VQ40DE).
Is the inspection result normal? 
Inspection End. Repair as needed.