LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2011 >> Grand Vitara Base >> Repair and Diagnosis >> Drivelines & Axles >> Driveshaft & Universal Joints >> Propeller Shaft >> Repair Instructions >> Propeller Shaft Disassembly and Assembly (2WD Model) >> Assembly
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Propeller Shaft Disassembly and Assembly (2WD Model): Assembly

Reference: PROPELLER SHAFT REMOVAL AND INSTALLATION 

NOTE: Make sure that rollers inside spider bearing race are all in place.
CAUTION: In assembly, be sure to use new circlips, spider (1) and bearings (2). Reuse of circlips, spider (1) and bearings (2) once assembled is prohibited.
Fig 1: Identifying Spider And Bearings
G06499975Courtesy of SUZUKI OF AMERICA CORP.
  1. Make sure to apply grease to spider bearing race.

    "A": Grease 99000-25030 (SUZUKI Super Grease C) 

    Fig 2: Applying Grease To Spider Bearing Race
    G06499976Courtesy of SUZUKI OF AMERICA CORP.
  2. Insert bearing race into yoke, using press, until it is flush with yoke face. When doing this, insert spider into bearing race to prevent rollers in bearing race from coming out.
  3. Aligning match marks (1) and insert the other bearing race on the opposite side into yoke, using press until it is flush with yoke face.
    Fig 3: Identifying Match Marks Location
    G06499977Courtesy of SUZUKI OF AMERICA CORP.
  4. Insert bearing races on the sliding yoke side in the same way as described in Step  1) and  2).
  5. Securely fit 4 circlips to shaft and sliding yoke.
    NOTE:
    • Make sure that each circlip is fitted in groove securely.
  6. After assembly, check to ensure that both shaft yoke and sliding yoke move smoothly.