LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2011 >> Equator Base >> Repair and Diagnosis >> Heating, Ventilation & A/C (HVAC) >> HVAC Control Systems >> Heating And Air Conditioning System >> Repair Instructions >> Expansion Valve: Removal and Installation >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Expansion Valve: Removal and Installation: Installation

Installation is in the reverse order of removal.

CAUTION:
  • Do not reuse O-rings.
  • Apply A/C oil to the expansion valve O-rings and the A/C refrigerant pipe O-rings for installation.
  • After charging refrigerant, check for leaks.

Front expansion valve bolts : 4.0 N.m (0.41 kg-m, 35 in-lb) 

A/C refrigerant pipe to front expansion valve bolt : 3.4 N.m (0.35 kg-m, 30 in-lb)