LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2011 >> Equator Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 30 (Engine Mechanical) >> Repair Instructions >> Cylinder Head Replacement - Right Side >> Removal Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Removal Procedure

WARNING: This page is about a different car, the 2007 Suzuki XL7. However, it is still accessible from the selected car via links, so may be relevant.
  1. Remove the engine. Refer to REMOVAL PROCEDURE .
  2. Remove the right bank secondary timing chain. Refer to SECONDARY CAMSHAFT DRIVE CHAIN REPLACEMENT - RIGHT SIDE .
    Fig 1: Identifying Cylinder Head
    G04841595Courtesy of SUZUKI OF AMERICA CORP.
  3. Remove the cylinder head with the exhaust manifold. Refer to CYLINDER HEAD REMOVAL - RIGHT SIDE .
    Fig 2: Identifying Cylinder Head Gasket
    G04841596Courtesy of SUZUKI OF AMERICA CORP.
  4. Remove and discard the cylinder head gasket.
  5. Clean and inspect the cylinder head and the engine block sealing surfaces. Refer to CYLINDER HEAD CLEANING AND INSPECTION  and ENGINE BLOCK CLEANING AND INSPECTION .
  6. If necessary, perform the following steps: