LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2010 >> SX4 2WD L4-2.0L >> Repair and Diagnosis >> Powertrain Management >> Emission Control Systems >> Positive Crankcase Ventilation >> Positive Crankcase Ventilation Valve >> Service and Repair
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Positive Crankcase Ventilation Valve: Service and Repair

PCV Valve Removal and Installation

Removal

1. Remove engine cover.
2. Disconnect PCV hose from PCV valve.
3. Remove PCV valve from cylinder head cover.

Installation
Reverse removal procedure for installation noting the following.
- Apply sealant to thread part of PCV valve (1).
- Tighten PCV valve to specified torque.

Tightening torque
PCV valve (a): 2.5 N.m (0.25 kg-m, 2.0 lbf-ft)

- Connect PCV hose to PCV valve securely.