Overdrive (Planetary Gear Side) Disassembly and Assembly: Disassembly
- With overdrive (O/D) clutch cylinder (1) held stationary, turn O/D input shaft (2) clockwise to check that it turns smoothly and then counterclockwise to check that it locks.
- Remove O/D planetary gear assembly (1).
- With O/D clutch assembly (2) installed to oil pump, apply compressed air (400 - 800 kPa, 4 - 8 kgf/cm2
, 57 - 113 psi) to oil hole (3) in oil pump (1) and measure stroke of clutch piston. If it is not within standard range, replace cushion clutch plate or clutch disc.
Standard stroke of clutch piston
1.74 - 2.44 mm (0.069 - 0.096 in.)
- Remove retaining ring (1) and then remove brake hub (2).
- Remove retaining ring (1), cushion plate (2), clutch plate (3) and clutch disc (4) in that order.
- With clutch piston return spring compressed with special tools, remove clutch piston return spring.
Special Tool
(A): 09918-48211
(B): 09926-98320
(C): 09918-48220
- Install O/D clutch cylinder to oil pump (2). Apply compression air into fluid hole (3) in oil pump (2) and remove clutch piston (1).
- Remove piston inner O-ring and piston outer O-ring from clutch piston (1).
- Remove retaining ring from O/D planetary gear and then remove one-way clutch, thrust washer and thrust bearing.