LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2009 >> XL7 Premium, AWD >> Repair and Diagnosis >> Transmission >> Automatic Transmission >> Repair Instructions >> Transmission Fluid Cooler Hose/Pipe Quick-Connect Fitting Disconnection and Connection >> Installation Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation Procedure

NOTE:
  • Do not reuse any of the existing oil lines or oil line fittings if there is excessive corrosion.
  • Do not reuse any of the existing retaining rings that were removed from the existing quick connect fittings. Install new retaining rings.
  • Ensure the following procedures are performed when installing the new retaining rings onto the fittings.
  1. Install a new retaining ring into the quick connect fitting using the following procedure:
    Fig 1: Installing Retaining Ring Into Quick Connect Fitting
    G06490238Courtesy of SUZUKI OF AMERICA CORP.
  2. Hook one of the open ends of the retaining ring in one of the slots in the quick connect fitting.
    Fig 2: Rotating Retaining Ring Around Fitting
    G06490239Courtesy of SUZUKI OF AMERICA CORP.
  3. Rotate the retaining ring around the fitting until the retaining ring is positioned with all three ears through the three slots on the fitting.
    Fig 3: Caution For Do Not Installing Retaining Ring Onto Fitting
    G06490240Courtesy of SUZUKI OF AMERICA CORP.
  4. Do not install the new retaining ring onto the fitting by pushing the retaining ring.
    Fig 4: Moving Freely In Fitting Slots
    G06490241Courtesy of SUZUKI OF AMERICA CORP.
  5. Ensure that the three retaining ring ears are seen from inside the fitting and that the retaining ring moves freely in the fitting slots.
    Fig 5: Identifying Cooler Line And Quick Connect Fitting
    G06490242Courtesy of SUZUKI OF AMERICA CORP.
  6. Install the cooler line into the quick connect fitting.
  7. Insert the cooler line end into the quick connect fitting until a click is either heard or felt.
    Fig 6: Identifying Plastic Cap And Cooler Line
    G06490243Courtesy of SUZUKI OF AMERICA CORP.
  8. Do not use the plastic cap on the cooler line in order to install the cooler line into the fitting.
  9. Pull back sharply on the cooler line in order to ensure that the cooler line is fastened into the quick connect fitting.
    Fig 7: Identifying (Snap) Plastic Cap And Fitting
    G06490244Courtesy of SUZUKI OF AMERICA CORP.
    NOTE: Do not manually depress the retaining clip when installing the plastic cap.
  10. Position (snap) the plastic cap onto the fitting. Do not manually depress the retaining ring when installing the plastic cap onto the quick connect fitting.
  11. Ensure that the plastic cap is fully seated against the fitting.
    Fig 8: Identifying Gap Present Between Cap And Fitting
    G06490245Courtesy of SUZUKI OF AMERICA CORP.
  12. Ensure that no gap is present between the cap and the fitting.
    Fig 9: Identifying Yellow Identification Band And Quick Connect Fitting
    G06490246Courtesy of SUZUKI OF AMERICA CORP.
  13. Ensure that the yellow identification band on the tube is hidden within the quick connect fitting.
    Fig 10: Identifying Hidden Yellow Identification Band Indicates Proper Joint Seating
    G06490247Courtesy of SUZUKI OF AMERICA CORP.
  14. A hidden yellow identification band indicates proper joint seating.
  15. Fill the transmission to the proper level with DEXRON® VI transmission fluid. Refer to TRANSMISSION FLUID CHECK .