Installation Procedure
WARNING: This page is about a different car, the 2008 Suzuki XL7. However, it is still accessible from the selected car via links, so may be relevant.
- Position the transaxle mount bracket (2) to the transaxle.CAUTION: refer to FASTENER NOTICE in Cautions and Notices.
- Install the transaxle mount bracket bolts (3).
Tightening torque
Tighten the bolts to 55 N.m (41 lb ft).
CAUTION: refer to FASTENER NOTICE in Cautions and Notices. - Install the transaxle mount bracket bolt (1).
Tightening torque
Tighten the bolts to 37 N.m (27 lb ft).
- Install the rear transaxle mount. refer to TRANSMISSION REAR MOUNT REPLACEMENT (GETRAG 760 TRANSFER CASE) .
- Install both catalytic converters. refer to CATALYTIC CONVERTER REPLACEMENT - RIGHT SIDE and CATALYTIC CONVERTER REPLACEMENT - LEFT SIDE .