LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2009 >> XL7 Luxury, AWD >> Repair and Diagnosis >> Electrical >> Charging Systems >> Diagnostic Information and Procedures >> DTC B1325: Device Power Circuit >> Circuit/System Testing
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Circuit/System Testing

  1. Engine running, accessories OFF, measure and record the battery voltage at the battery terminals. The voltage should be between 12.6 and 15.0 volts.
  2. Ignition OFF, disconnect the harness connectors at the appropriate module.
  3. Ignition OFF and scan tool disconnected, open and close the driver door, and wait 1 minute. Test for less than 5 ohms between the appropriate ground circuit terminals listed below and ground.
    • Terminal 6 (IPC)
    • Terminal D (PPS)
    • Terminal 8 X1 (Radio)
    • If greater than the specified range, test the ground circuit for an open/high resistance.
  4. Verify that a test lamp illuminates between the appropriate B+ circuit terminals listed below and ground.
    • Terminal 14 (IPC)
    • Terminal A (PPS)
    • Terminal 1 X1 (Radio)
    • If the test lamp does not illuminate, test the B+ circuit for a short to ground or an open/high resistance.
  5. If all the circuits test normal, test or replace the affected module.