LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2009 >> XL7 Limited, AWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 73 (Charging System) >> Diagnostic Information and Procedures >> DTC P0625 >> Circuit/System Testing
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Circuit/System Testing

WARNING: This page is about a different car, the 2008 Suzuki XL7. However, it is still accessible from the selected car via links, so may be relevant.
  1. Ignition OFF, disconnect the harness connector at the generator.
  2. Ignition ON engine OFF, observe the scan tool GEN-F Terminal Signal parameter, while repeatedly probing the generator field duty cycle circuit with a test lamp connected to battery positive voltage. The parameter should change from 0 percent to 99 percent.
    • If the parameter was not affected by the test lamp, test the GEN-F Terminal Signal circuit terminal 2 for a short to ground or an open/high resistance. If the circuit tests normal, then replace the ECM.
  3. If the circuit tests normal, then replace the generator.