LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2009 >> XL7 Limited, AWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 73 (Charging System) >> Diagnostic Information and Procedures >> DTC B1517 >> Circuit/System Verification
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Circuit/System Verification

WARNING: This page is about a different car, the 2008 Suzuki XL7. However, it is still accessible from the selected car via links, so may be relevant.
  1. Measure and record the voltage at the battery terminals with the engine OFF, and again with the engine running. Verify that the battery voltage is 11-13 volts with the engine OFF and 13- 16 volts with the engine running.
  2. Observe the scan tool BCM Battery Voltage parameter, and the Batt. Voltage High Res. parameter. The scan tool parameters should be within 2 volts of each other, and within 2 volts of the battery voltage measured in the previous step.
  3. Refer to DIAGNOSTIC AIDS .