LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2009 >> Grand Vitara Base, Standard >> Repair and Diagnosis >> Transmission >> Manual Transmission >> Repair Instructions >> Input Shaft Disassembly
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Input Shaft Disassembly

Reference: MANUAL TRANSMISSION UNIT DISASSEMBLY 

  1. Remove snap ring.
  2. Remove input shaft front bearing (1) using bearing puller and hydraulic press.
    Fig 1: Removing Input Shaft Front Bearing
    G06499121Courtesy of SUZUKI OF AMERICA CORP.
  3. Hold hatched area (5) of input shaft assembly (1) with "V" blocks (4) on vise (2) or the like to stop rotation of shaft, undo caulking and input shaft 5th hub nut (3).
    CAUTION: Do not hold spline, gear teeth or abrasived surface of shaft with vise through "V" blocks or the like, otherwise shaft components may be damaged.
    Fig 2: Holding Hatched Area Of Input Shaft Assembly
    G06499122Courtesy of SUZUKI OF AMERICA CORP.
  4. Apply bearing puller to 4th gear (1), and drive out 5th speed synchronizer hub (2), 3rd gear (3), high speed gear needle bearings, 3rd gear bush, high speed synchronizer assembly (4) and 4th gear all at once from input shaft using metal stick (5) and hydraulic press.
    CAUTION: To avoid gear teeth from being damaged, support 4th gear at flat side of bearing puller.
    Fig 3: Driving Out 5th Speed Synchronizer Hub
    G06499123Courtesy of SUZUKI OF AMERICA CORP.