Pressure Control Solenoid "B" Circuit Monitor: Operation
WARNING: This page is about a different variant/trim than selected.
PRESSURE CONTROL SOLENOID B OPERATION CHART
| DTC |
P0966/P0967 |
| Monitor execution |
Continuous |
| Monitoring duration |
0.5 seconds (P0966), 0.5 seconds (P0967) |