LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2009 >> Equator RMZ-4 >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System (VQ40DE) - (3 Of 5) >> DTC P1800: VIAS Control Solenoid Valve 1 >> Diagnosis Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Diagnosis Procedure

DIAGNOSIS PROCEDURE

Step Action YES NO
CHECK VIAS CONTROL SOLENOID VALVE POWER SUPPLY CIRCUIT 
  1. Turn ignition switch OFF.
  2. Disconnect VIAS control solenoid valve harness connector.
G06441592G06441593Courtesy of SUZUKI OF AMERICA CORP.SUZUKI OF AMERICA CORP.

  1. 3. Turn ignition switch ON.
  2. 4. Check voltage between terminal 1 and ground with SDT or tester.
G06441592G06441593Courtesy of SUZUKI OF AMERICA CORP.SUZUKI OF AMERICA CORP.

Voltage: Battery voltage 


OK or NG 
GO TO 3. GO TO 2.
DETECT MALFUNCTIONING PART 
Check the following.
  • Harness connectors E2, F32
  • Harness for open or short between VIAS control solenoid valve and IPDM E/R
  • Harness for open or short between VIAS control solenoid valve and ECM
Repair harness or connectors.  
CHECK VIAS CONTROL SOLENOID VALVE OUTPUT SIGNAL CIRCUIT FOR OPEN AND SHORT 
  1. Turn ignition switch OFF.
  2. Disconnect ECM harness connector.
  3. Check harness continuity between ECM terminal 29 and VIAS control solenoid valve terminal 2.

    Refer to WIRING DIAGRAM .

    Continuity should exist. 

  4. Also check harness for short to ground and short to power.

OK or NG 
GO TO 4. Repair open circuit or short to ground or short to power in harness or connectors.
CHECK VIAS CONTROL SOLENOID VALVE 
Refer to [P1800 VIAS CONTROL SOLENOID VALVE 1 ].
OK or NG 
GO TO 5. Replace VIAS control solenoid valve.
CHECK INTERMITTENT INCIDENT 
Refer to [SERVICE INFORMATION FOR ELECTRICAL INCIDENT: INTERMITTENT INCIDENT ]
INSPECTION END