LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2009 >> Equator RMZ-4 >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System (VQ40DE) - (1 Of 5) >> Diagnostic Information and Procedures >> Idle Speed and Ignition Timing Check >> Ignition Timing
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Ignition Timing

  1. Attach timing light to loop wire as shown.
    Fig 1: Attaching Timing Light To Loop Wire
    G06441190Courtesy of SUZUKI OF AMERICA CORP.
  2. Check ignition timing.
    Fig 2: Checking Ignition Timing
    G06441191Courtesy of SUZUKI OF AMERICA CORP.

Any of following two methods may be used.