Charging System Preliminary Inspection
DIAGNOSIS PROCEDURE
| Step | Action | YES | NO |
|---|---|---|---|
| 1 | CHECK BATTERY TERMINALS CONNECTION Check if battery terminals are clean and tight. Is the inspection result normal? |
GO TO 2 | Repair battery terminals connection. |
| 2 | CHECK FUSE Check for blown fuse and fusible link. Is the inspection result normal? |
GO TO 3 | Be sure to eliminate cause of malfunction before installing new fuse or fusible link. |
| 3 | CHECK GENERATOR GROUND TERMINAL CONNECTION Verify connector E209 terminal 5 (generator ground harness) is clean and tight. Is the inspection result normal? |
GO TO 4 | Repair connection. |
| 4 | CHECK DRIVE BELT TENSION Check drive belt tension. Refer to [CHECKING DRIVE BELTS ] (QR25DE) or [CHECKING DRIVE BELTS ] (VQ40DE). Is the inspection result normal? |
Inspection End. | Repair as needed. |