LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2009 >> Equator 4WD V6-4.0L >> Repair and Diagnosis >> Transmission and Drivetrain >> Transfer Case >> Service and Repair >> Overhaul >> Front Drive Shaft: Disassembly and Assembly
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Front Drive Shaft: Disassembly and Assembly

Front Drive Shaft: Disassembly and Assembly

DISASSEMBLY
1) Remove the front bearing using Tools.





Tool number A: ST35300000 ( - )
B: ST30021000 (J-22912-01)
2) Remove the rear bearing using Tools.





Tool number A: ST33710000 ( - )
B: ST30021000 (J-22912-01)

INSPECTION AFTER DISASSEMBLY

Front Drive Shaft
Check the items below. If necessary, replace them with new ones.





^ Damage, peeling, dent, uneven wear and bending of the shaft.
^ Excessive wear, damage and peeling of the gear.

Bearing
Check the bearing for damage and rough rotation. If necessary, replace the bearing with a new one.





ASSEMBLY
1) Install the rear bearing using Tools.





Tool number A: KV38100500 ( - )
B: ST30901000 (J-26010-01)
2) Install the front bearing using Tools.





Tool number A: KV38100500 ( - )
B: ST30901000 (J-26010-01)