LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2008 >> XL7 Base, AWD >> Repair and Diagnosis >> Electrical >> Charging Systems >> Diagnostic Information and Procedures >> DTC B1517 >> Circuit/System Verification
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Circuit/System Verification

  1. Measure and record the voltage at the battery terminals with the engine OFF, and again with the engine running. Verify that the battery voltage is 11-13 volts with the engine OFF and 13- 16 volts with the engine running.
  2. Observe the scan tool BCM Battery Voltage parameter, and the Batt. Voltage High Res. parameter. The scan tool parameters should be within 2 volts of each other, and within 2 volts of the battery voltage measured in the previous step.
  3. Refer to DIAGNOSTIC AIDS .