LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2008 >> XL7 Base, AWD >> Repair and Diagnosis >> Body & Frame >> Exterior Body Panels >> Body Structure >> Repair Instructions >> MIG Welded Full Panel Replacement >> Installation Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation Procedure

Fig 1: Applying GM-approved Weld-Thru Coating
G05471674Courtesy of SUZUKI OF AMERICA CORP.
NOTE: If the location of the original plug weld holes can not be determined, space the plug weld holes every 40 mm (1 1/2 in) apart. Where structural adhesive was present, space the plug weld holes every 20 mm (3/4 in) apart.
  1. Drill 8 mm (5/16 in) plug weld holes in the service part as necessary in the locations noted from the original panel.
  2. Prepare all attachment surfaces as necessary.
  3. Prepare all mating surfaces as necessary.
  4. Apply GM-approved Weld-Thru Coating or equivalent to all mating surfaces. Refer to ANTI-CORROSION TREATMENT AND REPAIR .
  5. Position the service part. Clamp in place.
    Fig 2: Applying Sealers And Anti-Corrosion Materials To Repair Area
    G05471675Courtesy of SUZUKI OF AMERICA CORP.
  6. Plug weld accordingly.
  7. Clean and prepare all welded surfaces.
  8. Apply the sealers and anti-corrosion materials to the repair area, as necessary. Refer to ANTI-CORROSION TREATMENT AND REPAIR .
  9. Paint the repair area. Refer to BASECOAT/CLEARCOAT PAINT SYSTEMS .
  10. Install all related panels and components.
  11. Connect the negative battery cable. Refer to BATTERY NEGATIVE CABLE DISCONNECTION AND CONNECTION .
  12. Enable the SIR system. Refer to SIR DISABLING AND ENABLING .