Circuit/System Verification
- Observe the scan tool Front Fog Lamps Switch parameter while pressing and releasing the fog lamp switch. The parameter should cycle between Active and Inactive.
- With a test lamp connected to ground, probe each of the test points on the FOG Fuse while commanding the Fog Lamps ON and OFF with a scan tool. The test lamp should turn ON and OFF at one or both of the fuse test points when changing between commanded states.
- With the fog lamps ON, verify the fog lamp indicator is illuminated on the IPC.