With Service Bay Test
Verify the EVAP system repair using the EVAP Service Bay Test
Without Service Bay Test
- Turn the nitrogen/smoke valve to nitrogen.
- Disconnect the EVAP vent line from the vent solenoid, and seal it, using the correct plug from the J 41413-300 .
- Use the remote switch to activate the J 41413-200 .
- Use the remote switch to introduce nitrogen and fill the EVAP system until the floating indicator stabilizes.
- Verify the flow meter's stable floating indicator position is at or below the red flag.
- Clear the DTCs with a scan tool.
IMPORTANT:
The EVAP vent solenoid valve will not remain closed when commanded ON with positive pressure applied to the EVAP system.