LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2008 >> Swift + >> Repair and Diagnosis >> Engine Performance >> System >> Engine Controls And Fuel - 1.6L - DTC P0317 To DTC P2610 >> DTC P0443 >> Circuit/System Testing
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Circuit/System Testing

  1. Ignition OFF, disconnect the harness connector at the EVAP purge solenoid.
  2. Ignition ON, verify a test lamp illuminates between the ignition 1 voltage circuit terminal 2 and ground.
    • If the test lamp does not illuminate, test the ignition 1 voltage circuit for a short to ground or an open/high resistance. If the circuit tests normal and the ignition 1 voltage circuit fuse is open, test all components connected to the ignition 1 voltage circuit and replace as necessary.
  3. Ignition OFF, connect a test lamp between the control circuit terminal 1 and the ignition 1 voltage circuit terminal 2.
  4. Ignition ON, command the EVAP purge solenoid ON and OFF with a scan tool. The test lamp should pulse ON and OFF with each command.
    • If the test lamp is always ON, test the control circuit for a short to ground. If circuit tests normal, replace the ECM.
    • If the test lamp is always OFF, test the control circuit for a short to voltage or an open/high resistance. If circuit tests normal, replace the ECM.
  5. If all circuits test normal, test or replace the EVAP purge solenoid.