Time required
WARNING: This page is about a different car, the 2006 Suzuki Reno and 2006 Suzuki Forenza. However, it is still accessible from the selected car via links, so may be relevant.
Time Length and Frequency:
Must receive 110 short low failures within 200 executions OR 110 short high failures within 200 executions.
Failure Time:
Continuous monitoring performed every 125 ms.